Change order of login options
complete
Markus
When trying to login with different login options enabled (eg. local and ldap), it first shows local login on initial page load and allows to select different ones at the bottom. Is there a way to reorder them, so that for example ldap login is shown first by default and local is an alternative?

Nicolas Giard
updated the status to
complete
Added in 2.5.

Nicolas Giard
Merged in a post:
Select default authentication method
Stephanos Constantinou
It would be could for the administrator to select the default authentication method on the login screen.

Nicolas Giard
updated the status to
in progress

Nicolas Giard
Merged in a post:
A default authentication method
Embaba
Have the ability, in the admin tools, to select the default authentication method when logging
Stephen Parsons
We're using Azure AD for our internal wiki. This confusion on the login page about how to login is causing a lot of people to assume the site is broken or that they don't have access, which really affects our uptake. It'd be great to be able to have the local login options collapsed by default when using something like AD as the main login.
Photo Viewer
View photos in a modal
iuooip
It would be nice to have option to hide choice of authentication methods and allow only one.
Local administration could be still available through
*/admin
*/administration
or whatever link suitable.

Nicolas Giard
updated the status to
planned